Lakeside Condos
,

Evermore at West Village Condos

Evermore at West Village Condos is a new pre-construction condo development by Tridel located at 10 Eva Road in Toronto. Evermore at West Village Condos will be 28 storeys with a total of 213 condo units. Estimated completion date is to be announced (TBA).
Rodeo Drive Condo Phase 2
, ,

Rodeo Drive Condo Phase 2

Rodeo Drive Condo Phase 2 is a new condo project by Lanterra Developments & Cadillac Fairview and is currently in pre-construction. Rodeo Drive Condos will be located at 169 The Donway West (near Don Mills and Lawrence East) in North York. Rodeo Drive Condo Phase 2 will be a tower with mixed condo units. The estimated completion date for Rodeo Drive Condo Phase 2 is set for October 2020.
Markham Square Condos 2
, ,

Markham Square Condos East Tower

Markham Square Condos East Tower is a new pre-construction Condo development by Ideal Developments & ONEPIECE Developments located at Main St Unionville & Enterprise Blvd., Markham. Markham Square Condos East Tower will stand at 29 storeys. Estimated completion is August 2021.
Birchcliff Townhomes
, ,

Birchcliff Townhomes

Birchcliff Townhomes is a new pre-construction townhome development by Core Development Group located at 1665 Kingston Road in Toronto (Kingston/Birchmount). Birchcliff Townhomes will have a total of 52 units.  Estimated completion date is to be announced (TBA).
Streetsville Centre Townhouses
,

Streetsville Centre Townhouses

Streetsville Centre is a new townhouse project by Dunpar Homes and is currently in pre-construction. Streetsville Centre Towns will be located at 80 Thomas Street in Mississauga. Streetsville Centre will be a collection of 201 townhouse units. The estimated completion date for Streetsville Centre is Fall 2019.
Westhaven On Islington Townhomes
, ,

Westhaven On Islington Townhomes

Westhaven On Islington townhomes is a new townhouse project by Tiffany Park Homes and Graywood Developments and is currently under construction. Westhaven Towns will be located at 1040 Islington Avenue in Etobicoke. Westhaven Towns will have a total of 176 townhouse units. The estimated completion date for Westhaven On Islington is Summer 2018.
, ,

Guildwood Condominiums

Guildwood Condominiums is a new condo project by Hazleton Developments that will be located at 3655 Kingston Road in Scarborough. Guildwood Condominiums will be an 9 storeys tower with a total of 99 condo units. The estimated completion date for Guildwood Condominiums is set for 2018.
AYC Townhouses
, , , ,

AYC Townhomes

AYC Townhomes is a new pre-construction townhomes development by Metropia & Diamondcorp that will be located near Avenue road and Dupont Street. AYC townhouse will feature 48 units in total with estimated occupation of spring 2020.
ME 2 Condos
, , ,

ME 2 Condos

ME 2 Condos is a new condo project by Lash Group Of Companies and is currently in pre-construction. Me Living Condos Phase 2 will be located at 1152 Markham Road in Toronto. (Markham/ Ellesmere). ME 2 Condos will be a tower with mixed condo units. The estimated completion date for ME 2 Condos is set for December 2020.
Lakeside Condos
, , , ,

Lakeside Condos

Lakeside Condos is a new condo development by Greenland Group located at Lake Shore Boulevard East & Lower Sherbourne Street, Toronto. Estimated completion date is July 2022.